Connect the Last Mile.Without Limitations.
Rural data centers and remote operations face the same problem: fiber isn’t there, and a single wireless technology can’t reach the capacity and availability they need. Meshcomm Engineering® closes that gap with a high-capacity link built on multiple physics, getting sites online 6 to 12 months sooner than fiber.
The +1 Path.
Data centers set the standard: two fiber routes, plus a third path on different physics, for 2N+1 availability. Meshcomm Engineering® builds and manages that third path for data centers and other high-capacity rural operations alike. It gets sites online while fiber is still under construction, then stays in service as permanent redundancy.
Talk to an Expert
Turnkey Connectivity.
From design to deployment and ongoing management, Meshcomm Engineering® provides a complete, turnkey solution with one experienced team and one point of contact.
- Assess Your Needs
- Engineer the Solution
- Deploy Hardware
- Manage & Monitor
- Ongoing Support
One Team. One SLA. One Point of Contact.